Project Owner:
City of Broken Arrow
200 S. First
Broken Arrow, OK 74012
Schedule:
Construction Phase 1 - 2005, Phase 2 - 2006
Construction Cost: Phase 1 - $1.8 Million, Phase 2 - $2.4 Million
|
 |
|
The City of Broken Arrow approved bond issues that provided the
funds to build two phases of the Broken Arrow Public Safety Training Facility
that was designed by BKL, Inc. These facilities have been designed as durable
buildings that would require low maintenance. The Phase
1 facility houses the administrative and classroom training functions for both
the police and fire departments. The second is a large scope training facility
sited to the south. Part of the master plan for this site includes outdoor
training functions.
Some of the items Included in the design are Physical Training
Room with Showers & Lockers, Serving Kitchen, Large Gathering/Training Space,
and Offices. |