First United Methodist Church

Home
Up

First United Methodist Church, Owasso, Oklahoma       

Project Owner:

First United Methodist Church

13800 106th Street North

Owasso, OK 74055

Pastor Chris Tiger (918) 272-5731

 

Schedule:  Construction  2005

Construction Cost: $5.5 Million

 

BKL developed the master plan for the new First United Methodist Church in Owasso, Oklahoma. BKL first assisted the church in selecting the 12.5 acre site, then met with the church officials and congregation to create a project “program” for the master plan of the facility. We researched and collated information and needs for all aspects of the congregation. We worked closely with the building committee to create a master plan that satisfied those needs. We provided a phase one project to begin the master plan and construction of the church was completed in early 2006.

 

One of the features of the church is that it is close to an elevated highway. The congregation requested a design that would be prominent to the highway and the surrounding neighborhood. We provided a two story design with detailing that provides interest from the highway and the local neighborhood streets. BKL is excited to be part of the First United Methodist Church project.