Project Owner:
City of Tulsa, Public Works
Mr. Henry Som de Cerff
(918) 596-9636
|
Schedule:
Design 2005/2006
Construction Completed 2009
Estimated Cost:
$1,800,000 |
|
This project consisted of widening East 15th Street and South
Utica Avenue from an existing 4-lane to 5-lane to add left turn bays in all four
directions. This location was a difficult area to improve because of the
existing right-of-way not being sufficient to allow for the proposed street
widening and many of the existing buildings encroaching on the standard
right-of-way for this type of improvement. The utility relocations were also
challenging. BKL was responsible for grading, drainage, vertical/horizontal
alignment, paving, storm sewer, waterline relocation, construction sequencing
and right-of-way acquisition.
|