Project Owner:
Tulsa County Criminal Justice Authority
|
Schedule:
Design 2000, Construction 2001
Estimated Cost:
$200,000 |

|
|
BKL designed the David L. Moss Criminal Justice Center in Tulsa.
As part of our scope of work for the project, BKL was responsible for preparing
construction documents for rehabilitation of Archer Street from Lawton Avenue to
Denver Avenue.
The roadway was 2 driving lanes and a bike lane in each direction
for a distance of 0.24 miles. The improvements consisted of milling existing
asphalt pavement, removing and replacing damaged curbs and sidewalks, patching
pavement failures, rehabilitation of existing inlets and manholes, overlay
asphalt, and striping.
|